Quality Control Engineer
Talgo Inc12 months ago
Milwaukee, Wisconsin, United States
On-site
Full-time
Junior Level (1-3 years)
Job Description
Position Overview
Based in Milwaukee, WI and operating in the Railway Industry, Talgo Inc. refurbishes passenger railcars for LA Metrolink at our Milwaukee facility—extending their service life by 30 years. We are seeking a proactive Quality Control Engineer to lead and support quality initiatives, ensure compliance with ISO standards, and drive continuous improvement in a collaborative, fast‑paced manufacturing environment.
Key Responsibilities
- Lead root cause analysis and implement corrective/preventive actions for recurring quality issues
- Develop and maintain inspection procedures, audits, and quality control plans aligned with ISO 9001
- Collaborate with design, production, and supply chain teams to ensure product conformity
- Analyze quality data using KPIs to identify risks, trends, and opportunities for improvement
- Oversee non‑conformance management including investigation and resolution
Required Qualifications
- Bachelor’s degree in Mechanical, Industrial, or Manufacturing Engineering (or related field)
- 3‑5 years of experience in a quality engineering role within a manufacturing/industrial environment
- Knowledge of ISO 9001, SPC, and root cause analysis tools (5 Whys, Fishbone, FMEA)
- Experience with NDT, metrology, and ERP systems (SAP a strong plus)
- ASQ certification (CQE, CQA) and/or Spanish language skills desirable
- Must pass a pre‑employment drug test; physically able to stand, walk, use hands, occasionally lift up to 25 lbs, work at heights, and work in manufacturing environments where PPE is required
Benefits & Perks
- $1,000 Hiring Bonus
- 100% Employee Insurance Coverage (Medical, Dental, Vision)
- 50% Dependent Health Benefits
- 401(k) with Company Match
- Paid Holidays and a Generous PTO Policy
- Opportunities for Career Growth
Required Skills
Metrology
ISO 9001
NDT
Quality Control Auditing
SPC
Inspection Procedures
Fishbone Diagram
ERP (SAP)
5 Whys
Root Cause Analysis
FMEA